![]() ![]() “These parking configurations would yield a total of 361 parking spaces, 16 more than what is required for the rec center expansion and the existing facilities in the area,” Hildreth wrote. Hildreth says the new parking spaces could come from an installation under the expanded rec center, through a reconfiguration of the remaining rec center lot and The Seasons north lot, and additional spaces added along Benchmark Road and Lake Street. 161 new spaces will be required to accommodate the new facilities and loss of parking.” “A multi-purpose room/gym, expanded fitness room and flex meeting/yoga room will add approximately 32,750 square feet to the recreation center, requiring 76 additional parking spaces for a total of 345 spaces required for the public facilities. The ice rink will require the closing of the west recreation center parking lot and the loss of the 44 parking spaces,” wrote Hildreth. “An ice rink is proposed for the west side of the recreation center, in the location of the grass field and parking lot near the pool. In order to accommodate an expanded rec center facility, a shift in the town’s current parking configuration would be in order.Īccording to a memo provided by town engineer Justin Hildreth, the rec center expansion, which would occur on the east side of the existing building in the East Recreation Center Lot, would result in a net reduction of approximately 69 parking spaces, depending on the final design. A $2 million facility in Minturn is expected to be complete in spring of 2014. “(Avon’s) not so busy now, and it’s because our neighboring towns have done so much,” said councilman Dave Dantas.Ī $6 million field house was constructed in Edwards in 2009, and Gypsum opened its $12 million rec center at the start of 2007. ![]() The plan - which would be funded through an increase in property taxes - has been met with near-unanimous support from Avon’s elected officials, who say keeping up with other nearby towns is important to the area’s future. Base building (fitness/cardio area, indoor playground): $2,786,108ĪVON - Council members want to move forward with a plan to spend $7.7 million improving the rec center, but first they’ll need voter approval on Nov.Ice rink/summer activity center: $290,000Ĭost estimates on proposed rec center improvements.Upper field reconstruction (grass): $350,000.Natural stream play learn area: $770,000.By the numbers Cost estimates on proposed non-rec center improvements
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |